Can a switch be included in the charger circuit to facilitate collection of duration of charge data? Reveal Questions NO. The components of the charging system are limited to the items specified in the Rules. A switch is not an allowable component. ‹ Can a connector be used on the battery pack to enable meter connection for motor off capacitor voltage measurement? Can a volt meter be included in the charging system? ›