Do I need to demonstrate the Pass-Thru test while the Bridge is on the Test Stand, or can I pick up my Bridge to maneuver the Pass-Thru block within the interior of the structure?

Demonstrating the Pass-thru capability can be performed at check-in and does not require that the Bridge be mounted on the test stand. However, maneuvering the Pass-Thru block around internal Bridge members is not allowed. It is recommended that the Bridge be placed on a flat surface and that the Pass-Thru demonstration be performed by smoothly moving the block horizontally from one end of the bridge to the other. Teams that do not properly execute the Pass-Thru demonstration will have Bridge ranked in Tier 2.